Business

India to End Power Grid SCADA Imports by 2030

Published: 25 August 2026 · 1 min read

What Happened

The government has decided to stop importing SCADA (Supervisory Control and Data Acquisition) systems used to monitor and operate India’s power grid after 2030. A Central Electricity Authority (CEA) roadmap aims to develop indigenous SCADA software and hardware by 2028-29, reducing dependence on foreign vendors for critical grid operations and cybersecurity support. Current grid-level SCADA systems have less than 20% local content.

Key Takeaways

The move is a strategic push for energy security, cybersecurity and technological self-reliance. By localizing critical grid-control systems, India aims to reduce foreign dependence in a sensitive infrastructure sector and strengthen resilience against cyber threats targeting the power network.

Sources

Moneycontrol, Powerline