India to End Power Grid SCADA Imports by 2030
What Happened
The government has decided to stop importing SCADA (Supervisory Control and Data Acquisition) systems used to monitor and operate India’s power grid after 2030. A Central Electricity Authority (CEA) roadmap aims to develop indigenous SCADA software and hardware by 2028-29, reducing dependence on foreign vendors for critical grid operations and cybersecurity support. Current grid-level SCADA systems have less than 20% local content.
Key Takeaways
The move is a strategic push for energy security, cybersecurity and technological self-reliance. By localizing critical grid-control systems, India aims to reduce foreign dependence in a sensitive infrastructure sector and strengthen resilience against cyber threats targeting the power network.